VCS-896Source-linked project dossier
Foz Do Chapecó Project
Foz do Chapecó Hydroelectric Project developed by Foz do Chapecó Energia S/A consists of the installation of a hydroelectric plant, located in the verge of Águas de Chapecó municipality, in Santa Catarina State, and Alpestre municipality, in Rio Grande do Sul State. Total installed capacity of the Project will be 855 MW, consisting of four sets of hydroelectric Francis type turbines with nominal capacity 217.14 MW and the electricity generator nominal power is 213.75. The purpose of the Project is to use the hydrological resources of the Uruguay River in order to generate low emissions electricity for the Brazilian Interconnected System (SIN – Sistema Interligado Nacional), thereby displacing electricity that is relatively carbon intensive, and reducing greenhouse gas (GHG) emissions
Project context
Reported project and monitoring facts
Historical monitoring values are attributed to the linked report for its stated period. They are not recalculated or guaranteed by CarbonBlaze.
- Installed capacity
- 855 MW
- Methodology
- ACM0002
- Reported monitoring calculation
- 1,289,349 tCO₂e
- Crediting period
- October 14, 2010
Reported in the monitoring report and provider project record.
Grid-connected electricity generation from renewable sources
For the stated monitoring period: 2010-10-14 to 2012-06-30.
2010-10-14 to 2020-10-14; report states it may be renewed up to two times
Location and source context
A hydropower record in southern Brazil
Between Águas de Chapecó, Santa Catarina, and Alpestre, Rio Grande do Sul, Brazil
The local record stores the Carbonmark project response, a project-specific price response, a structured index of the historical monitoring report, and a separate secondary infrastructure source. Each record is retained with a retrieval timestamp and checksum.
- Source coordinates
- -27.14, -53.043326
- Sustainable-development tags
- SDGs 7, 8, 9, 13
- Registry
- VCS project 896
- Monitoring report
- Issued November 19, 2012
Marketplace observation
Current captured listing context
Provider data captured Sep 20, 2026, 03:19 PM UTC. This is a local observation, not an executable quote. The live provider quote controls any later transaction.
| Network | Vintage | Captured price | Liquid supply | Minimum fill | Observed |
|---|---|---|---|---|---|
| Base | 2011 | 0.1 USDC / t | 0.499 t | 0.001 t | September 20, 2026 |
| Base | 2011 | 0.574 USDC / t | 367,809.2 t | 0.001 t | September 20, 2026 |
| Polygon | 2012 | 0.7 USDC / t | 0 t | 0.001 t | September 20, 2026 |
| Polygon | 2011 | 0.77 USDC / t | 0 t | 0.001 t | September 20, 2026 |
| Polygon | 2012 | 2.8 USDC / t | 0 t | 0.001 t | September 20, 2026 |
At the last local source capture, 2 Base listings showed positive liquid supply. Availability and price can change; this page does not reserve, offer, or execute credits.
Evidence trail
Primary documents and retained source captures
Carbonmark project record
Carbonmark project page — VCS-896
Current marketplace project record; listing and inventory fields are time-sensitive.
Source: Carbonmark
Monitoring report
Foz do Chapecó Hydro Power Plant monitoring report — Version 04
Historical report issued 19 November 2012, covering 14 October 2010 through 30 June 2012.
Source: Monitoring report
Program context
Verified Carbon Standard program overview
Program-level context; not a project-specific rating or approval.
Source: Verra
Registry project record
Verra Registry — VCS Project 896
Official registry link. Dynamic fields should be read from the registry directly.
Source: Verra Registry
Secondary infrastructure context
Power plant profile: Foz do Chapeco, Brazil
Secondary infrastructure context; separate from registry or provider records.
Source: Power Technology / GlobalData
Local provenance record
CarbonBlaze retains 4 immutable source captures for this dossier. Each capture retains the source URL, retrieval time, content type, and checksum. The public page shows normalized fields and links; it does not expose raw provider payloads.
- • secondary infrastructure context — captured Sep 20, 2026, 03:19 PM UTC
- • monitoring report structured extract — captured Sep 20, 2026, 03:19 PM UTC
- • carbonmark project prices api — captured Sep 20, 2026, 03:19 PM UTC
- • carbonmark project api — captured Sep 20, 2026, 03:19 PM UTC